Skip to content
PRIME EMAREngineering • Contracting
Engineer testing switchgear equipment in a power substation
06EngineeringContractingInfrastructure
Services

Testing,Commissioning&TAB

Prime Emar provides testing, commissioning and TAB services that verify systems perform to design intent before handover.

Electrical, HVAC and generator testing, verification and performance sign-off across MEP systems.

  • Electrical Testing
  • LV/MV Testing
  • Insulation Resistance Testing
  • Earth Resistance Testing
  • Thermal Imaging
  • Power Quality Analysis
  • HVAC Testing
  • Testing, Adjusting & Balancing (TAB)
  • Generator Testing
  • UPS Testing
  • Load-Bank Testing
01

Electrical Testing

Insulation resistance, earth resistance and power quality testing.

02

HVAC Testing & Balancing

System testing, adjusting and balancing to design airflow and capacity.

03

Backup Power Testing

Generator, UPS and load-bank testing under simulated load conditions.

04

Verification

Documented sign-off confirming systems perform to specification.

Applications
Data centers
Commercial buildings
Industrial facilities
Infrastructure projects
How We Work

From engineering to operation

A structured delivery framework that carries every project from initial scope to ongoing support.

  • 01

    Understand

    Scope, requirements and technical constraints are established with the client.

  • 02

    Engineer

    Systems are designed and coordinated across disciplines.

  • 03

    Execute

    Installation is carried out to specification and program.

  • 04

    Test

    Systems are tested against design intent before commissioning.

  • 05

    Commission

    Verified systems are handed over with supporting documentation.

  • 06

    Support

    Maintenance and facility support sustain performance post-handover.

Build with precision.

Talk to Prime Emar about your next engineering, contracting or infrastructure requirement.